If you have any questions, or would like to enquire about us working on your next project, please get in touch . We would love to be part of your success story.
We replaced the sewer pump station at the Dongara marina for Ventia.
Water main installation connected to a Water Corporation asset. We ran a 1km+ water main installation for subdivision in Dongara.
We installed a 4.5m alloy concrete sewer pumping station at the local caravan park. We then ran a 90ml pumped pressure sewer main about 950m under the roads and through crown land up to the gravity main. The sewer pumped from the car park into the Water Corporation’s sewer. On completion of the job, the Water Corporation assumed ownership.